USGS: USGS TM 1-A1 GWPD 10
Title
| GWPD 3-Establishing a permanent measuring point and other reference marks |
---|---|
Author
| Cunningham, W.L., and Schalk, C.W. (comps.) |
Abstract/Summary Statement
| See procedural document for exact instructions about how to establish a permanent measuring point and other reference marks. The following is a general summary of the method: Establish and determine altitude of land-surface datum. Establish measuring point. Determine measuring point correction length. Establish additional reference marks. |
Table of Contents
| Proceedural document for estimating discharge from a pumped well by use of a circular orifice weir |
Citation
| Cunningham, W.L., and Schalk, C.W., comps., 2011, Groundwater technical procedures of the U.S. Geological Survey: U.S. Geological Survey Techniques and Methods 1-A1, 151 p. |
Method Source
| USGS |
Source Organization Country
| USA |
Publication Year
| 2011 |
Special Notes
| |
Item Type
| Report / Guidance Document |
Publication Source Type
|
Government Agency (Federal, USA) |
Purpose
|
Monitoring program design |
Design or Data Analysis Objectives
|
Exploring/summarizing data Revisit |
Complexity
| Low |
Media Emphasized
|
Groundwater |
Media Subcategory
| |
Special Topics
|